The Standard Work Combination Sheet (SWCS) (sometimes called the Standardized Work Combination Chart, Graph or Table) is part of the documentation of Standard Work.
The Standard Work Combination Sheet shows the interaction of people and machine, and how both fit into the takt time.
The Standard Work Combination Sheet links to the Standard Work Sheet. The Time Observation Sheet is used to record time studies that determine how long each stem on the Standard Work Combination Sheet takes.